Craig J. Opperman P.E., Scioto County Engineer, announced the work schedule for the week of September 26, 2016 through September 30, 2016 for his office.

ROAD CLOSURES

Flatwood – Fallen Timber Road (CR184) in Jefferson Township at the 0.56 to 1.03 mile markers continues to be closed through Thursday, December 1st, 2017. Portsmouth Joint Venture is excavating road embankment for construction of State Route 823 and constructing a bridge.

Ohio River Road (CR503) in Porter Township continues to be closed through Friday, September 30th. Columbia Gas is relocating their gas lines for the SR823 project and Portsmouth Joint Venture is installing storm sewer lines. The location of the closure is between State Route 140 to and including the intersection of Hastings Hill Road (CR251).

Flowers – Ison Road (TR381) in Jefferson Township continues to be closed through Friday, September 30th. The location of the closure is just east of Blue Run Road intersection. Portsmouth Joint Venture will be installing a box culvert.

Shepherd Fork Road (CR145) in Washington Township at the 0.275, 0.700 and 0.860 mile markers will be closed Monday, September 26th from 7:00 A.M. to 5:00 P.M. The location of the closure is between Nauvoo – Pond Creek Road and Dry Run – Pond Creek Road. County Engineer’s crew will be installing plastic pipes.

Shepherd Fork Road (CR145) in Washington Township at the 0.977, 1.586 and 1.790 mile markers will be closed Tuesday, September 27th from 7:00 A.M. to 5:00 P.M. The location of the closure is between Nauvoo – Pond Creek Road and Dry Run – Pond Creek Road. County Engineer’s crew will be installing plastic pipes.

Brame Road (CR61) in Madison Township at the 0.862, 0.904 and 0.923 mile markers will be closed Wednesday, September 28th from 7:00 A.M. to 5:00 P.M. The location of the closure is between White Gravel – McDaniel Road and Slusher Road. County Engineer’s crew will be installing plastic pipes.

Brame Road (CR61) in Madison Township at the 1.024, 1.268 and 1.723 mile markers will be closed Thursday, September 29th from 7:00 A.M. to 5:00 P.M. The location of the closure is between Slusher Road and White Gravel – Dewey Road. County Engineer’s crew will be installing plastic pipes.

LANE RESTRICTIONS

Haverhill – Ohio Furnace Road (CR8) in Green Township continues to have lane restrictions through Friday, November 11th. The location of the construction is from US52 to one mile west toward Gallia Pike. Allard Excavation is widening the road.

BRIDGE REPLACEMENT

Mackletree Road (TR99) in Nile Township at the 4.81 mile marker continues to be closed through Friday, November 4th day and night. The location of the closure is between State Route 125 and the Shawnee State Park shelter house. Sunesis Construction is replacing a bridge.

DRAG PATCH (weather permitting)

Laurel Lick Road (CR63) in Bloom Township Monday, September 26th.

Gephart Road (CR13) in Bloom and Harrison Townships Tuesday, September 27th and Wednesday, September 28th

Jackson Furnace Road (CR11) in Bloom Township Thursday, September 29th.

Traffic will be maintained with the use of flaggers. County Engineer’s crew will be drag patching the road.

ASPHALT PAVING (weather permitting)

Monday, September 26th, Tuesday, September 27th, Wednesday, September 28th and Thursday, September 29th Lucasville – Minford Road (CR28)

Saturday, October 1st Gable – Curtis Road (TR460), Lowery Hollow Road (TR162), Normandy Drive (TR421) and Westview Avenue (TR1061).

The Shelly Company will be doing the paving.

ROAD IMPROVEMENT

Washington Boulevard (CR50) in Washington Township continues with curb and storm sewer installation The location of the work is from Galena Pike to Nauvoo – Pond Creek Road and from Galena Pike to north of Dixie Avenue. Contractor will utilize segmental road closures. Allard Excavation, LLC are performing waterline, curb, gutter and storm sewer installation prior to resurfacing.

Galena Pike (CR482) at Washington Boulevard (CR50), south end, will be closed from 7:00 A.M. Monday, September 26th through 5:00 P.M. Wednesday, September 28th day and night. Allard Excavation, LLC will be installing a storm sewer.

MOWING

Lang Slocum Road and Dogwood Ridge Road in Porter Township.

Tick Ridge Road in Bloom and Harrison Townships.

Lick Run – Lyra Bloomswitch Road in Porter and Vernon Townships.

Big Bear Creek Road in Morgan and Rarden Townships.

Colley Road in Rush Township

Carey’s Run – Pond Creek Road in Rush, Union and Washington Townships.

Slab Run Road in Washington Township.

Visit us on the web at SciotoCountyEngineer.org